Safe Deployment
How to prepare a site, validate tasks, and run the J1600 safely from commissioning through daily operation.
Site Risk AssessmentWhy a site risk assessment precedes J1600 deployment, what the commissioning package covers, and which site factors to evaluate before go-live.Floor and Environment RequirementsThe J1600's operating-environment limits: floor flatness, gradeability, bumps and gaps, temperature, humidity, and ingress protection.Approved Loads and PalletsWhich pallets and load carriers the J1600 supports — open-base requirement, size and weight limits, EPAL and GMA types, and where operator judgment applies.Charger SafetySafe charging of the J1600 with the manual or automatic charger, the PL b charging-current relay, and what the LiFePO4 battery means for the site.Operator ResponsibilitiesWhat the J1600 operator is responsible for — task initiation, manual pickup, confirming autonomous mode, takeover, and the judgment calls the robot leaves to people.Commissioning and ValidationThe J1600 installation and commissioning package: five days from feasibility check and risk assessment to task validation, training, acceptance test, and handover.Residual RisksThe risks that remain after the J1600's safeguards — operating limits, manual-mode situations, and why deployment decisions need current product documentation.