Skip to main content

Site Risk Assessment

Before the J1600 goes live at a site, the site, the selected tasks, and the loads should be assessed for risk. This page describes what that assessment involves and which factors matter for a dual-mode pallet jack.

Where risk assessment fits

Risk assessment is the method at the heart of ISO 12100, which appears in the J1600's compliance list: identify hazards, evaluate risks, and reduce them in order of priority. The vehicle's built-in safeguards handle the machine side; the site assessment handles everything the machine cannot know about your facility.

When the installation and commissioning package is purchased, its pre-installation phase covers this formally:

  • a feasibility check for all selected tasks and loads;
  • a risk assessment;
  • a project plan.

Site factors to evaluate

The J1600's operating limits define what to check:

FactorWhat to verifyDetails
FloorsLevel routes for autonomous travel (0% automatic gradeability), bumps up to 25 mm, gaps up to 20 mm, TR34 FM3 / FF 25 / FL 20 flatnessFloor and environment requirements
EnvironmentIndoor use, 5–40°C, 20–80% relative humidity non-condensing, IP21 exposure limitsFloor and environment requirements
LoadsOpen-base carriers within 1,250 × 1,250 mm, up to 1,600 kg and 1,700 mm load heightApproved loads and pallets
Manual-only areasSlopes, dock plates, and ramps stay manual tasks; manual gradeability is 5% unloaded and 3% at full loadOperator responsibilities
TrafficRoutes shared with pedestrians and other vehicles, congestion points, and where the speed-dependent protective field needs roomHow J1600 safety works
ChargingPlacement and setup of the manual or automatic chargerCharger safety

Residual responsibility

A completed risk assessment does not remove the operator from the loop. Task initiation, pallet pickup, and judgment-heavy handling remain human responsibilities by design, and some risks remain after safeguarding — see Residual risks.

Use current product documentation

No safety-distance curves, stopping distances, or validation reports are published in the Knowledge Center. Base deployment decisions on the current product documentation supplied with the vehicle.