Site Readiness GuideWhat to check at your facility before a J1600 arrives — floors, climate, pallets, charging location, network, and space — so the robot can go to work on day one.Operating Environment RequirementsThe J1600's environmental limits — temperature, humidity, ingress protection, gradeability, bumps, gaps, and floor class — for autonomous and manual operation.Floor RequirementsFloor flatness class, gradeability, bump and gap tolerances, ground clearance, and wheel details that determine where the J1600 can drive autonomously.Network and Wi-Fi RequirementsWhen the J1600 needs Wi-Fi and when it does not — basic teach-and-repeat operation is network-free, while come-to-me, VDA 5050, APIs, and fleet management use connectivity.Charger InstallationInstalling the J1600's manual or automatic charger — how each option works, charging and drain rates, list prices, and what to plan before delivery.Mapping and Drop-Point SetupHow to map a facility with the J1600 by driving it manually, save drop points with Save location, and build the first autonomous tasks — no code, no infrastructure.Safety ValidationWhat safety validation covers when commissioning a J1600 — the risk assessment, the certified safety functions to confirm on site, and the documentation to rely on.Deployment ChecklistA start-to-finish checklist for deploying a J1600 — site checks before delivery, the out-of-box path, the optional five-day commissioning package, and go-live.